PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Compacting allong column line 6.5 between C.7-D.5 Facing South-West (800x600).jpg Finished installing the grease interceptor at Room 105 (Servery) Facing North-East (800x600).jpg Installing bearing plate boxes at Elev. 5,6 (4th Floor) Facing North-West (800x600).jpg Installing shear wall panels at Elev. 5,6 (4th Floor) Facing South-West (800x600).jpg Metal stairs at Stair -5 Facing North-West (800x600).jpg Shear wall panels at Elev. 1,2,3 (3rd Floor) Facing South-West (800x600).jpg Welding beam connections at Derrick -3 (2nd Floor) Facing North Pic -2 (800x600).jpg Working on the Sprinkler Room piping Facing East (800x600).jpg
Previous pageNext page Metal stairs at Stair -5 Facing North-West (800x600)
Metal stairs at Stair -5 Facing North-West (800x600)